21 April 2012
The last day was really a tough challenge to me !
And it is also the day that I can say is the TEAM BUILDING activity !
From 10 team has been combined to 4 teams.
The mission was to raise our National flag.
It was not easy...
| Few PVC pipe to go... |
| Holding the string... |
| Sure is difficult |
| Enough said |
| Planning & Control |
| Balancing. |
| Control the string.... |
| As if eveyone is playing kite... |
It took us as in FOREVER to build the flag pole !
The team building ends approximately around 12pm.
Bus will arrive at 2pm.
MO has offer me a ride home together with Anton.
Thank you bosses ! :)
-----
L♥ve,
pLaTinA

1 Liar(s):
Post a Comment