Front Page Photo

Front Page Photo

Story Behind the Photo

Professional Henna by Sheema Henna Artist
After the solemnization, my partner & I rushed to change for the reception clothes. Yea, the man have it easy.. Just the clothes & I, was rushing to get my reception henna done & voila~

(Photo by Mr Aswad Bakhri)

Powered By Blogger
Showing posts with label Work. Show all posts
Showing posts with label Work. Show all posts
0 Liar(s)

Back to Blog

Thursday, June 24

Image by Klook.com

12 May 2021 where the Movement Control Order 3.0 starts.

As for me, working in a construction/waste water industry, working time remains the same.  But with rotations as the government instructions at 60% capacity in the office.  Too bad my project site crew needs to work at 100%.  Well, they would not be at office all the time as they will be at site monitoring the subcontractor.

To a surprised that my rotation partner will be Kak Yus, Personal Assistant to Managing Director's Office.  As I thought that Kak Sha will be a better candidate to take care of the Managing Director's Office.  Oh well~  We came to an agreement of 5 working days as our Human Resource mentioned that we have to be "in office" every week.   Therefore our arrangement is from Thursday to Wednesday.  Woohoo~  7 days break before going back to work.

Well, 7 days at home does not mean I'll be productive (cleaning) at home.  But Aoshi has given me lots of encouragement on trying new recipes (via Instagram... Hey, it helps and wish me luck).  But I won't be cooking all the time as its only the 2 of us at home.  Still trying to pick up some new hobbies (as for now, plant some veggies at the balcony) and still trying to get myself to read more.. 

Thank you, Aoshi for listening and being there for me.


-----
L❤ve,
pLaTinA
0 Liar(s)

Michelle Eliza Johnny Teo

Monday, February 27

Never thought that my last event is going to be a night that I would remember for my entire life.
It's the day I've lost a joyful soul, a good friend and an awesome colleague, Michelle Eliza Johnny Teo.

I knew her back in Johor Bahru as she's one of the Preservation Engineer.
A hot engineer with class & style.
As you would not see any woman engineer wearing a coverall and holding a Prada handbag.
Only her.

Mark on the 25th Feb 2017 , it was the day 

I really miss you so much, Michelle...
God must have love you so much.
Knowing the world is not meant for you but to be at God's place.




---
L♥ve,
pLaTinA


0 Liar(s)

Tower 3 Firedrill

Wednesday, November 26

2 years in this company.
We never had a fire drill exercise.
Until today.

One of the colleague got too excited for the drill

Thank fully, no one panicked.
It was the opposite, they're seems happy with the drill.
Fire drill = stop work in commence.

Its a way down from level 20...

After we reach at god-knows-what-floor-was-that, there was a firetruck and ambulance right outside the building.

Yes, I was amazed by it.

Firetruck !

Triage Area

Its a looooooong walk to the assembly area.
Makes me think, "Dammit, I've should done my exercise regularly"
Anyway, it was a fun walk with Ms Rachel. :)

The one on the right with the grey blouse, Ms Rachel

Reached at the assembly point, and did the head count for my section.

This is how I did the head count.... Kidding.

Took us around 45 minutes - an hour for them to release us from the assembly area.

They gave us treat after the fire drill

I know it might sound so weird, is indeed a fun fire drill day :D


-----
L♥ve,
pLaTinA
0 Liar(s)

Eye Twitching

Friday, March 29

Source : http://healthable.org/beautiful-secrets-for-beautiful-eyes/

It really irritates me when my left eye start twitching.
Do you ever felt the same experience as I do ?
I notice that my eyes start twitching whenever I'm having stress mode 
or during the time of the month.

Until yesterday, I'd google on "Eye Flinch" and found out few reasons on this matters:


  • Stress (might be)
  • Tiredness (I don't feel tired...)
  • Eye strain (Hmmm... Does smart phone counts?)
  • Caffeine (I dont't take coffee...)
  • Alcohol (I don't drink...)
  • Dry Eyes (Sometimes)
  • Nutritional Imbalance (HOLY !!!)
  • Allergies (Nahhh)

My conclusion is that, 5 out of 9 the reasons my left eye keep twitching.
I guess I should to change on my food consumption and exercise more.


Source: http://www.notconsumed.com/2012/11/26/lie-11-exercise-is-not-the-enemy/

A self reminder...

And found out something fun to read about eye twitching!
The title itself is already catchy...
Signs And Omens – What Do Your Eye Twitches & Tics Mean ??


-----
L♥ve,
pLaTinA
1 Liar(s)

PRD Team building 2012 (Final Day)

Sunday, April 29

21 April 2012
The last day was really a tough challenge to me !
And it is also the day that I can say is the TEAM BUILDING activity !
From 10 team has been combined to 4 teams.
The mission was to raise our National flag.
It was not easy...

Few PVC pipe to go...

Holding the string...

Sure is difficult

Enough said

Planning & Control

Balancing.

Control the string....

As if eveyone is playing kite...

It took us as in FOREVER to build the flag pole !

The team building ends approximately around 12pm.
Bus will arrive at 2pm.
MO has offer me a ride home together with Anton.

Thank you bosses ! :)

-----
L♥ve,
pLaTinA
0 Liar(s)

PRD Team building 2012 (Day 2)


20 April 2012
The dawn of second day...
I have forgotten that I was still in PD.
Nice.

Breakfast around 7.30am.

Before 9am, we are already in the hall.
The next activity was finding clues on how to kill the vampire !
It sure was tough !
Its like a treasure hunt + detective game...

Lead by BKS ! Woohoo !

The whole team !

To find all the clues at 10 different locations...
Its well hidden... Really well hidden...

Stop for a break

Our last stop. Hate it ! :(

This is where the discussion begins...

Still discussing tho

We even negotiate with other teams for the information that we might not get.

BKS on finalizing solution

It is definately a fun mystery. But me and the team change the answer at the last minute.
Therefore... We kind of come out with the most unique answer among all.
Funny times...

Right after the activity, I invited OKH, SNSAH and also AHI to chill out at my room !
Since I got the GM's room... Hehehe..

OKH showing his skills

Watching DVD

Approximately 8pm, the 'Red Carpet' theme happens...
It was extremely cooL !!!
Never thought that it could be a WOW factor.

PI bossess

THE Senior SEXYtaries

PI BC team ! (Kindly exclude me ;p)

The BC team

Yes, I was at the table with BC team.
Coz it was nearer to the exit door...

Our cooL Senior Manager, MAAH !

I can say... Its 70% of PRD group !

Cam whoring with CMZ

CooL backdrop

And that's how our Red Carpet night ends...

-----
L♥ve,
pLaTinA
0 Liar(s)

PRD Team building 2012 (Day 1)

It happens so fast !
As if it's as fast as blink of an eye.
For 3 days and 2 nights.
It was a unforgettable experience.

Here's the awesome part.
Team building never taught us on how to work together.
but to be competitive...
Right ?

Well, its my own perspective on the team building.
Here are the chronology of the event :)
Please be aware that, my hand tend to be shaky...
Therefore most of the photos did not turn out well :)

19 April 2012
We have told to gather down at the KLCC tower by 8.30am !
The first thing went I got there, the police stopped me from entering the Tower 1.
I do not know if I'm not wearing anything decent...
I think I wear just fine.
More clothes than skin...
Hmmm... Funny...

We depart from KLCC around 8.40am.
And our breakfast... McD breakfast set !!!
Did not managed to snap the photos due to "I'm so hungry that I have to eat it right now"

Bus #3

And I seat way~ at the back with CMZ & BKS :)

We reached at the Selesa Beach Resort around 10.15'ish am.
PRD Staff gathered at the main hall.

The first to sit

The stylo PI

Quarter of E1

The E3 and E4
Cool bosses

After the speech by our awesome SGM and a break...

Awesome boss

The trouble was...
The day before we arrived at the Selesa Beach Resort, there was a conference for the government teachers event was going on too.
We have to wait the room to cleaned, since most of them checking out really late...

While waiting for the room key :)

My boss, MRS did not manage to attend this team building due to family matters.
Therefore, instead of sharing room with people, Superior Room...
I took his room. A deluxe room.
Yes, I'm fully aware that I'm a bad person.

We have been instructed to wear the team building shirt

Divided into 10 teams, I was in team #5.
And we called it High-5.
Funny. It does sound like the bread brand thingy.
The team leader was BKS and has 14 people in the group.
Guess what...
There were 8 of us from Project Implementation.
We come to a conclusion that we would not expand our social networking skills much for this team building.

The first task was a bit ridiculous !
Some are reasonable and some are difficult.
They called it 'The Amazing Search'
Here are the task:

1. Find the first letter of the name cards and complete with word 'PETRONAS'.

2. Make a hat from plants.
 
3. Find 5 different type of currencies.
4. Find 5 red ants.
5. Find 5 mosquitoes
6. Find 5 grasshoppers
7. Find 5 earthworms
8. Find 2 live spiders

Ridiculous right ?!?
But somehow we managed to find it.
After the 'The Amazing Search', the moment we all waiting for...

SPORTS BY THE BEACH !

Beach Volleyball

Sepak Takraw

Beach soccer

 The sports did not end there !
After the sports, some of them went...

For a swim ! Again, most of them are from Project Implementation...


And we had dinner by the pool after the Maghrib prayers :)


Awesome first day.

-----
L♥ve,
pLaTinA